To the Top

138w -- Components of productivity change (value added/hours worked), 1976-2020*

Choose variables

Select the data you want from the selection boxes. In the end, press the “Show table” button. User instructions.
Mandatory
Field for searching for a specific value in the list box. This is examples of values you can search for.Labor productivity (va) , Contribution of residential buildings intesity to labor productivity (va) , Contribution of other buildings intesity to labor productivity (va) ,

Selected 1 of total 11

Mandatory
Field for searching for a specific value in the list box. This is examples of values you can search for.1976 , 1977 , 1978 ,

Selected 1 of total 45

Mandatory
Field for searching for a specific value in the list box. This is examples of values you can search for.Total , B Mining and quarrying (05-09) , 05-09 Mining and quarrying ,

Selected 0 of total 78

Number of selected data cells are:
(maximum number allowed is 1,000,000)

Presentation on screen is limited to 1,000 rows and 300 columns

Number of selected cells exceeds the maximum allowed 1,000,000
Description of statistic
Concepts and definitions
Changes in these statistics
... confidential Non-market producers (producer type T30) and agriculture are not included here. When examining labour productivity, the intensity of the capital asset is = the number of capital services of the capital asset per hour worked. E.g. ICT capital intensity = the number of capital services in ICT equipment per hour worked. The contribution of the change in the quality of labour input is the effect of changes in the quality of labour force (age, gender, level of education) on productivity/the change in value added. The contribution of reallocation of hours worked describes the movement of labour from one industry to another. The contribution of total productivity is derived as a residual when all other contributions related to the labour force and capital have been calculated and the change in productivity/value added is known.

Year

* preliminary data

Year

2019*

* preliminary data

2020*

* preliminary data