To the Top

119y -- Cost index of civil engineering works (2015=100), (2010=100), (2005=100), (2000=100), (1995=100) and (1990=100) M, K, S and H-index, 1990-2020
Variable overview
Information
Mandatory *
Year
Mandatory *
Index base year
Mandatory *
Type
Mandatory *
Select the data you want from the selection boxes. In the end, press the "Show table" button. User instructions

Information

Mandatory *

Selected 0 of total 2

Year

Mandatory *
Field for searching for a specific value in the list box. This is examples of values you can search for.1990 , 1991 , 1992 ,

Selected 0 of total 31

Index base year

Mandatory *

Selected 0 of total 5

Type

Mandatory *

Selected 0 of total 4

Number of selected data cells are:
(maximum number allowed is 1,000,000)

Presentation on screen is limited to 1,000 rows and 300 columns

Number of selected cells exceeds the maximum allowed 1,000,000

Footnotes

Description of statistic
Concepts and definitions
Type
M, K, S and H indeces are index clause indeces. They don't include wages, indirect labour costs and travel and daily allowances. Base year 2010=100 and 2005=100 M-index is total index without concrete structures, K-index is index for rock structures, S-index is index for concrete structures, H-index is index for management and maintenance. Base year 2000=100, 1995=100 and 1990=100 M-index is total index without bridge building work, K-index is index for rock construction work, S-index is index for bridge building work and H-index is index for management and maintenance.
Information
Cost index of civil engineering point figure
Point figure is a change quantity used in price indices, which expresses the price, average price or index of the comparison period relative to the price, average price or index of the base period. The point figure of the base period is usually denoted by the number hundred. For example, if the point figure for a commodity at a certain point in time is 105.3, it means that the price of that commodity has risen by 5.3 per cent from the base period.