117u -- Cost index of civil engineering works (2015=100), indices by structure, 2015-2020
Variable overview
Information
Mandatory *
Year
Mandatory *
Type
Mandatory *
Select the data you want from the selection boxes. In the end, press the "Show table" button. User instructions

Information

Mandatory *

Selected 0 of total 2

Year

Mandatory *

Selected 0 of total 6

Type

Mandatory *
Field for searching for a specific value in the list box. This is examples of values you can search for.11-17 Total index , 11 Foundation structures , 12 Earth structures ,

Selected 0 of total 13

Number of selected data cells are:
(maximum number allowed is 1,000,000)

Presentation on screen is limited to 1,000 rows and 300 columns

Number of selected cells exceeds the maximum allowed 1,000,000

Footnotes

Description of statistic
Concepts and definitions
Information
Cost index of civil engineering works (2015=100) point figure
Point figure is a change quantity used in price indices, which expresses the price, average price or index of the comparison period relative to the price, average price or index of the base period. The point figure of the base period is usually denoted by the number hundred. For example, if the point figure for a commodity at a certain point in time is 105.3, it means that the price of that commodity has risen by 5.3 per cent from the base period.
Cost index of civil engineering works (2015=100) annual change, %
Cost index of civil engineering works point figures annual change %.