118r -- Building and dwelling production, 1995M01-2019M08
Mark your selections and choose between table on screen and file format. Marking tips

For variables marked Select at least one value you need to select at least one value

Information Select at least one value

Total 4 Selected

Search

Month Select at least one value

Total 296 Selected

Search

Classification of Buildings 1994 Select at least one value

Total 21 Selected

Search

Construction stage Select at least one value

Total 3 Selected

Search


Number of selected data cells are:(maximum number allowed is 1,000,000)

Presentation on screen is limited to 1,000 rows and 300 columns


Number of selected cells exceeds the maximum allowed 1,000,000
Contact and information

Information

Latest update
10/22/2019
Contact
Further information
Statistics' homepage
Unit
Volume (m3):
m3
Floor area (m2):
m2
Dwellings (No.):
kpl
Building permits (No.):
kpl
Next update
11/26/2019
Creation date
9/25/2018
Source
Building and dwelling production, Statistics Finland
Matrix
002_118r_2019m08
Footnotes

Footnotes

Revisions on these statistics
Description of statistic
Concepts and definitions
Changes in these statistics
Classification of Buildings 1994
The intended use of a building is determined according to the purpose for which the largest part of the gross floor area of the building is used. The classification of the intended use of buildings is given in Statistics Finland's Handbook Classification of Buildings 1994. Not all the classes in the building classification are included in the Statitics Finland's building stock.
Information
Building permits (No.)
A building permit is a licence to build which is issued in accordance with the Land Use Act and the Planning and Construction Act and is granted by the municipal building control or environmental control authority dependent on the size of the building project. A notification must be made of all building projects subject to a building permit, and statistics on building and dwelling production are compiled from the information in these notifications. Projects subject to a building permit comprise construction of a new building, construction of an annex, repairs and alterations comparable to the construction of a new building, extension of a building or increase of the space included in its floor area, and essential change of the purpose of use of a building or part of a building.